162763

Pink Biothane long lead 3 m x 12 mm - nickel-plated snap hook

This pink Biothane leash, 3 m x 12 mm, is designed for professional daily use. Durable, flexible, waterproof, and easy to clean, it offers a comfortable grip and reliable attachment with its nickel-plated snap hook.
€21.95 Tax included

In Stock

Description

The Biothane leash is made from BIOTHANE BETA HEAVY, a material renowned for its durability, flexibility, and resistance. Easy to clean, waterproof, and resistant to abrasion and humidity, it is perfectly suited for daily use.

Its matte grain leather look and soft surface offer a good grip, while its flexibility remains pleasant even in cold weather. It is equipped with a nickel-plated snap hook for a reliable attachment.

Technical Specifications

  • Main material : BIOTHANE BETA HEAVY
  • Color : Pink
  • Length : 3 m
  • Width : 12 mm
  • Snap hook type : Nickel-plated
Features
  • Informations
    Value
  • Color
    Pink
  • Material
    Biothane
  • Width
    12 mm
  • Length
    3 m
  • Muskete
    nickel-plated
  • Countryman
    France

Similar products

226019_1_produit.PNG 226019_2_226019_insitu.JPG
LONGE X-TRACK- Wild Tracker

The X-TRACK 6M Wild Tracker leash, inspired by mountaineering, offers extreme traction resistance and flexibility. Its rot-proof and water-repellent polyester, with zinc alloy carabiner, guarantees professional all-weather reliability.

starting at €23.80 Tax included
140063_1_produit.png
2 m x 10 mm lanyard rope

This 2m x 10mm rope leash is designed for dog training and hunting or tracking activities. Its robustness ensures reliable and durable use.

€10.00 Tax included
Loading...